Services

Design, model, test.

Appoint us for one study or for the whole envelope journey — from concept build-ups to the final airtightness certificate.

01

Envelope design

Build-up options compared for U-value, carbon, cost, fire and buildability.

RIBA 1–4
02

Thermal bridging

ψ and χ values to ISO 10211, with redesign proposals for weak junctions.

2D / 3D
03

Hygrothermal

Transient WUFI models for internal insulation, timber and heritage walls.

EN 15026
04

Airtightness

Strategy, membrane detailing, interim and final blower-door tests.

UKAS
05

Thermography

Infrared surveys with heat-loss mapping and prioritised fixes.

Level 2
06

Facade review

Independent review of contractor designs, samples and mock-ups.

Stage 4–5

Process

How an appointment runs

  1. Review

    We read the drawings and specification and list the risks.

  2. Model

    Critical junctions and build-ups are modelled and optimised.

  3. Detail

    Clear 1:5 details and a membrane strategy for site.

  4. Test

    Interim and final tests prove the envelope performs.

FAQ

When should we appoint you?

At concept stage ideally — build-up and junction decisions are cheapest before planning.

Do you only work on new buildings?

No, about half of our work is retrofit and heritage, where moisture risk is often the critical question.

How long does a thermography survey take?

A typical building is surveyed in one cold morning; the report follows within a week.

Can you test during construction?

Yes — interim airtightness tests before linings go up are the most effective way to hit targets.