Masterplan · Footscray · 2026

Riverside Blocks

Thirty-two hectares of old rail yards turned into a walkable neighbourhood of 3,400 homes, a primary school and a river park.

3,400homes, 25% affordable
9 haparks and river edge
2 stopsnew tram stops on site
4,800jobs in mixed blocks
Axonometric massing of the masterplan
Land use

A patchwork, not a zoning map.

Instead of separating homes from work and shops, every block mixes at least three uses. Ground floors are flexible; upper floors are homes; the river edge is public all the way along.

  • Homes 38%
  • Parks & river 24%
  • Streets & transit 18%
  • Work & retail 12%
  • School & community 8%
Phasing

Built in four patches

Phase 1 · 2027Phase 2 · 2029Phase 3 · 2031Phase 4 · 2034River park · from day one
Walkability

Everything within twelve minutes.

The school, tram stops, supermarket and river park are placed so that every home is within a twelve-minute walk of all four.