Services specification

Scope of services

Appoint us for a single task or for the whole journey. Each service has a clear scope, deliverables and fee basis.

SCHEDULE FE
CodeServiceTypical deliverablesStage
FE-01

Facade design

System strategy, design intent and specification.

Design report, typical details 1:5, performance specification

Concept – Tender

FE-02

Structural glass

Fins, canopies, balustrades, point-fixed walls.

Calculations, FE models, connection details

Design – Construction

FE-03

Thermal & condensation

Heat-flow modelling and energy compliance.

U-value reports, ψ-values, condensation risk assessment

Any stage

FE-04

Testing & mock-ups

Performance mock-up programmes and witnessing.

Test plan, witness reports, failure investigation

Pre-construction

FE-05

Shop drawing review

Review of fabrication drawings and calculations.

Comment sheets within 5 working days, sample approvals

Construction

FE-06

Site inspection

Installation audits and quality control.

Inspection reports, hose tests, snag lists

Construction – Handover

FE-07

Existing facades

Surveys, defect diagnosis and refurbishment.

Condition survey, remediation design, cost plan

Any stage

Process

How an appointment runs.

  1. Step 01BriefWe review drawings and agree scope within a week.
  2. Step 02OptionsSystem options with cost and risk comparison.
  3. Step 03DesignDetails, calculations and specification.
  4. Step 04ProveMock-ups and testing before production.
  5. Step 05DeliverReview, inspection and handover.

FAQ

Common questions

When should a facade engineer be appointed?

Ideally at concept stage. Early decisions on module size, system type and floor-to-floor height have the biggest impact on cost and performance.

Do you work for contractors as well as clients?

Yes — we act as design engineer for contractors, or as the client's independent consultant. We never do both on the same project.

Which standards do you design to?

Eurocodes and EN 13830 as standard, plus local codes such as ASTM / AAMA for the Middle East and CWCT-type test sequences where specified.

How are fees calculated?

Either a fixed fee per stage or a rate per m² of facade. We send a transparent fee proposal within five working days of receiving drawings.