Systems & services

From study
to installation.

We can join at any stage: a shading study for the architect, a complete design-and-build package, or maintenance of an existing kinetic facade.

01

Shading study

Sun path, glare, daylight and cooling-load comparison of shading options for your design.

2–4 weeks
02

Fixed fins & louvres

Aluminium, terracotta, timber or GRC blades — designed, fabricated and installed.

Up to 900 mm deep
03

Kinetic systems

Motorised louvres and folding screens with sun-tracking control and BMS integration.

25-year drives
04

Parametric screens

Perforated or folded metal screens with patterns optimised per orientation.

CNC from 3D model
05

Maintenance

Inspection, cleaning and drive servicing for kinetic facades — ours and others'.

24 h response

FAQ

Are kinetic systems worth the extra cost?

On east and west facades with high glazing ratios, usually yes: payback through cooling savings is typically 8–12 years. Our study tells you honestly when fixed fins are enough.

What happens in strong wind?

Blades move to a safe position automatically above the design wind speed and return when it drops.

Can you work with our facade contractor?

Yes. We often supply the shading package while the facade contractor installs the curtain wall.

Which materials can you use?

Aluminium, stainless steel, terracotta, timber, GRC and textile — chosen for climate, maintenance and appearance.