Preconstruction
Budgets, cost models, constructability and value analysis, scheduling and phasing plans from the earliest sketch.
Every owner carries a different balance of risk, schedule and control. We offer each major delivery method — and we will tell you honestly which one fits your project.
Budgets, cost models, constructability and value analysis, scheduling and phasing plans from the earliest sketch.
We join during design, commit to a guaranteed maximum price and return savings to you at close-out.
Competitive lump-sum bids on completed documents, with the same field leadership and safety programme.
One contract for design and construction, led by Stanwick with architects and engineers we know well.
Our own crews for concrete, carpentry, doors and hardware, and interiors — control over the critical path.
Renovations inside hospitals, courts and campuses that stay open — infection control, phasing and night work.
Choosing a delivery method
Ratings reflect typical projects over $20M — five dots is strongest.
| Method | We join | Price certainty | Schedule speed | Owner control of design | Best for |
|---|---|---|---|---|---|
| CM at-RiskGuaranteed maximum price | Schematic design | Complex, phased or occupied buildings; public owners allowed to select on qualifications | |||
| Design-BuildSingle point of responsibility | Concept / bridging | Owners who value speed and one contract over detailed design control | |||
| General ContractingDesign-bid-build, lump sum | Bid documents | Straightforward buildings with complete documents and low-bid procurement rules | |||
| Preconstruction onlyFee-based advisory | Any stage | Feasibility, bond referendums and budgets before a method is chosen |
Our process
We study your site, budget and procurement rules before we propose anything.
Estimates at every design milestone, a logistics plan and a baseline schedule.
Open bidding to prequalified trade partners, with local and small-business outreach.
Weekly owner reports on cost, schedule, safety and quality — the same report we read.
Commissioning, training, warranty walks at months 6 and 11, and a decade of phone calls.
Questions
Something else? Our preconstruction team answers within one business day.
Under CM at-risk, we commit to a ceiling price once design is sufficiently developed. If the final cost is lower, the savings are returned to you; if it is higher, Stanwick absorbs the overrun.
Yes. Roughly half of our work is for public owners. We are familiar with state and local procurement statutes for CM at-risk, design-build and competitive sealed bids across Virginia, North Carolina and DC.
Through open, documented bidding to prequalified firms. We review safety records, financial strength and capacity, and we publish bid results to the owner.
Typically $5 million to $300 million. Our special projects group handles smaller renovations and repeat work for existing clients.
Performance and payment bonds are available up to $750 million per project through our A-rated surety. Certificates are included in our prequalification packet.