Govan
Housing

Section through the housing block
Client
Clydeside Housing Co-op
Programme
64 homes, 3 shops
Area
6,850 m²
Structure
In-situ concrete
Envelope
Brick, timber windows
Cost
£1,940 / m²
Completed
March 2025
Status
Occupied

A block that can take a beating.

The brief from the co-op was blunt: build homes that last a hundred years, cost nothing to maintain and never need cladding replaced. We answered with a concrete frame, a brick skin and timber windows that can be repaired by any joiner in the city.

Every flat is dual aspect. Deck access on the north side doubles as a long shared balcony where neighbours meet; private balconies face south over the river.

The ground floor is 4.5 m high so the shops can become workshops, a nursery or more homes. Services run exposed in the corridors so they can be replaced without breaking a single wall.

Embodied carbon was halved against the first design by removing basements, using cement replacement and reducing the number of materials from eleven to four.

Typical floor plan
Fig. 1Typical floor
Axonometric of the block
Fig. 2Massing
Long section
Fig. 3Long section through deck access