7 live sites 412 days without a lost-time incident 186,000 t of steel erected since 1979 Tender desk open — reply within 48 h ISO 9001 · 14001 · 45001

Company · Est. 1979

47 years of
heavy lifting.

A family-owned contractor that still fabricates its own steel, employs its own erectors and answers its own tender desk. 340 people, two yards, one standard.

Fabrication shop · Teesside Section drawing through a multi-bay steel building

Our story

From two erectors and a borrowed crane.

Jim Corran started erecting other people's steel in Attercliffe in 1979 with one partner, a flatbed and a crane he borrowed on Fridays. By 1994 clients were asking him to take on the whole building — so he did, and Corran became a design & build contractor.

Today we design, fabricate and build industrial buildings up to 80,000 m². Our Teesside shop processes 9,000 t of steel a year, and every frame we erect is put up by our own crews. That control is why we can promise dates — and keep them.

Milestones

Built in stages.

  1. 1979FoundedSteel erection crew in Attercliffe, Sheffield.
  2. 1994First design & buildA 6,000 m² warehouse for a local haulier.
  3. 2008Teesside yardOwn fabrication shop and paint line.
  4. 2016In-house designArchitects and engineers join the team.
  5. 20264.8M m²Built under roof across 210 projects.

Leadership

The people who sign the programme.

Portrait of Fiona Corran

Fiona Corran

Managing Director

Portrait of Dev Malhotra

Dev Malhotra

Operations Director

Portrait of Tomasz Wrona

Tomasz Wrona

Head of Steel

Portrait of Grace Okafor

Grace Okafor

Health, Safety & Environment

Portrait of Liam Fairley

Liam Fairley

Preconstruction Director

Portrait of Hannah Birch

Hannah Birch

Commercial Director

Plant & yard

We own the kit.

No waiting for hire companies at the critical moment. Our fleet is serviced in-house and booked from the same programme as the steel.

  • 9,000 tAnnual fabrication capacity, EN 1090 EXC3
  • 2 × 100 tMobile cranes with own appointed persons
  • 14Mobile elevating work platforms
  • 3Telehandlers and 2 rough-terrain forklifts
  • 1Automated beam line, saw and shot-blast
  • 48 mPaint line for two-coat factory finish

Accreditations

Audited, every year.

ISO 9001Quality managementCertified since 2003
ISO 14001Environmental managementCertified since 2011
ISO 45001Occupational health & safetyCertified since 2019
EN 1090Steel fabrication EXC3Factory production control
01

Zero harm

Everyone goes home in the same condition they arrived. We stop a job before we hurt someone.

02

The date is a promise

We publish the programme on day one and report against it weekly — good news and bad.

03

Own the detail

If we drew it, we fabricate it. If we fabricate it, we erect it. No gaps to fall between.