7 live sites 412 days without a lost-time incident 186,000 t of steel erected since 1979 Tender desk open — reply within 48 h ISO 9001 · 14001 · 45001

Design & build · Structural steel · Since 1979

Built for
heavy loads.

We design, fabricate and build logistics hubs, factories, energy plants and data halls across the North of England — one contract, one programme, one team from piling mat to handover.

CIB-2291 · RIDGEWAY HUB Axonometric drawing of a logistics park with large single-storey steel sheds
3,200 t steel54,000 m² under roof38 wk
4.8Mm²Built under roof
186ktSteel erected
47Years in the trade
92%Repeat clients

02 — Safety first, every shift

The board at every site gate.

Every Corran site shows the same board at the gate — updated each Monday at 07:00. Nobody walks onto a job without seeing how we are doing.

  • Site-specific induction for every operative and visitor
  • Daily activity briefings and weekly toolbox talks
  • Lift plans signed by an appointed person for every crane lift
  • Near-miss reporting rewarded, never punished
Site safety boardAll Corran sites

Days without a lost-time incident

0412
0.04Accident frequency rate per 100k h
1,846Near-miss reports 2026
2,612Toolbox talks delivered
1.42MHours worked this year
Hard hatHi-visBootsGlovesEye protection

Updated Mon 07:00 · Target: zero harm

03 — On site now

Seven live sites.

All projects
Pennine Data Hall 2Leeds · 12,800 m² · Data centre
Steel frame
64%
Handover Q2 2027
Calder Valley Recycling HallWakefield · 14,600 m² · Energy & waste
Roof & cladding
78%
Handover Jan 2027
Halvern Foods Phase 3Hull · 8,400 m² · Manufacturing (live site)
Groundworks
22%
Handover Sep 2027
Ashby Edge Logistics Unit 5Derby · 41,000 m² · Logistics
Slab & docks
86%
Handover Dec 2026

05 — How a job runs

Greenfield to keys
in 34 weeks.

Our process
  1. Wk 0AppraisalSite visit, constraints and a budget within 10 days.
  2. Wk 2DesignScheme, planning drawings and fixed price.
  3. Wk 8FabricateSteel cut, drilled and painted in our own shop.
  4. Wk 12ErectFrame up, roof on, building weathertight.
  5. Wk 24FitSlab, docks, offices and services.
  6. Wk 34HandoverCommissioned, tested and racking-ready.
Built for Northgate LogisticsHalvern FoodsPennine DataBrightwater EnergyAldred AutomotiveKessock Cold Chain

“Corran told us the date the racking could go in before the steel was ordered. They hit it — nine days early, with zero reportable incidents on a 600-person site.”