Routes · 2014 – 2026
All routes
Every project is a route from a question to a built result. Filter by mode to see where we've been.
1
Limmat Tram Extension
4.2 km of new tram line connecting two growing districts to the centre.
StudyOptionsDesignBuild 2029
4
Velo Network 2030
A 120 km cycle network where every home is 300 m from a protected route.
DataNetworkConsultPhase 1
3
Night Bus Redesign
A simpler, more frequent night network for shift workers and students.
SurveyRedesignLaunch 2026
2
Regional Rail Hubs
Six small-town stations redesigned as mobility hubs with bikes, buses and parcels.
FeasibilityDesignPilot
5
School Streets Programme
Forty streets closed to cars at school times — and kept that way.
TrialMonitorPermanent
6
Valley Demand Model
An open travel-demand model for a region of 400,000 people.
DataModelOpen source