Est. 1994 // Brooklyn VIC

Thirty-two years, first pour right.

Coldset started with one ute, a cement mixer and a crew of four formworkers in Melbourne's west. Today we are 140 people with our own yard, our own pumps and our own engineers — still family-owned, still on the tools.

Direct crew140
Apprentices18
OfficesMelbourne · Brisbane
Repeat clients78%

Pour 02 // Story

We still build the forms ourselves.

Most concrete subcontractors hire in the formwork, the steel fixers and the pump. We never have. Keeping every trade on our own payroll is slower to grow, but it means the person who designed the form is on site when it's stripped.

That is why architects bring us their hardest walls, and why builders keep calling us back for basements nobody else wants to price.

  1. 1994
    Four formworkers, one ute

    Ray Castellano starts Coldset in Footscray, pouring house slabs and driveways.

  2. 2003
    First post-tensioned slab

    Our own stressing crew is trained and certified; PT becomes half of our work.

  3. 2011
    The Brooklyn yard

    A 1.4 ha yard with a carpentry shop, rebar cage bay and sample-panel pad.

  4. 2017
    Brisbane office opens

    Following two civil clients north; 38 crew based in Queensland today.

  5. 2026
    1.86 million m³

    Placed since day one — and still no structural failure on our record.

64Formwork carpenters
28Steel fixers
22Concrete finishers
12Pump & plant operators
14Engineers & estimators

Pour 03 // Leadership

People who've stripped a form.

Every member of the leadership team started on site. You'll meet at least two of them before we sign a contract.

Portrait of Danielle Okoro

Danielle Okoro

Managing director

Joined in 2003 as a site engineer; ran the Brooklyn yard for six years before taking over the business.

Portrait of Ray Castellano

Ray Castellano

Founder & chair

Formworker since 1979. Still walks every architectural pour and signs the sample panels himself.

Portrait of Mei-Lin Tran

Mei-Lin Tran

Engineering manager

Leads temporary works, PT design and the shop-drawing team of nine. Chartered structural engineer.

Portrait of Tomasz Kowal

Tomasz Kowal

Operations, Melbourne

Runs the yard, plant and crew allocation across seven Victorian sites. Ex-pump operator.

Portrait of Hemi Walker

Hemi Walker

Safety & training lead

Owns the safety system, the toolbox programme and the apprentice pathway. 22 years on site.

Portrait of Priya Raman

Priya Raman

Branch manager, Brisbane

Built the Queensland civil book from zero to 38 crew; previously a bridge site manager.

Pour 04 // Yard & plant

Our own kit, our own yard.

UnitPlantSpecQty
BP-01–03

Truck-mounted boom pumps

36, 42 and 52 m reach

3

LP-01–02

Line pumps

To 120 m horizontal, 90 m³/h

2

SF-WALL

System wall & column formwork

Steel-framed panels, 80 kN/m² pour pressure

6,000 m²

TF-DECK

Table forms & slab props

Crane-lifted, 3.0 × 6.0 m tables

2,400 m²

TC-01–02

Tower cranes

Flat-top, 50 m jib, 2.1 t at tip

2

ST-01–04

PT stressing rams

Mono-strand + multi-strand, calibrated monthly

4

Axonometric of the Brooklyn yard with carpentry shop, rebar bay and sample-panel pad
Yard 7 · Brooklyn1.4 ha · carpentry · rebar · samples

Pour 05 // Safety

Audited, certified, signed every shift.

Our integrated management system is externally audited twice a year. The numbers below are reported to every client monthly — the good ones and the bad ones.

QMSISO 9001

Quality management — inspection and test plans for every element, certified since 2006.

EMSISO 14001

Environmental management — washout recovery, 30% SCM mixes as standard, recycled form timber.

OHSISO 45001

Occupational health & safety — pre-pour permits, exclusion zones and fatigue rules.

LTI-free days
1,214
TRIFR · 12 months
1.1
Hours worked FY26
298k
Toolbox talks FY26
7,420

Pour 06 // Apprentices

Learning the trade on real pours.

Our apprentices spend their first month in the yard building sample panels, then join a site crew with a dedicated mentor. Formwork carpentry and steel fixing, four-year programme, paid trade school days.

Apply for 2027 intake
18Apprentices on the tools
1 in 8Crew came through the program
94%Completion rate since 2010
6Now foremen or supervisors