Pour 02 // Story
We still build the forms ourselves.
Most concrete subcontractors hire in the formwork, the steel fixers and the pump. We never have. Keeping every trade on our own payroll is slower to grow, but it means the person who designed the form is on site when it's stripped.
That is why architects bring us their hardest walls, and why builders keep calling us back for basements nobody else wants to price.
- 1994Four formworkers, one ute
Ray Castellano starts Coldset in Footscray, pouring house slabs and driveways.
- 2003First post-tensioned slab
Our own stressing crew is trained and certified; PT becomes half of our work.
- 2011The Brooklyn yard
A 1.4 ha yard with a carpentry shop, rebar cage bay and sample-panel pad.
- 2017Brisbane office opens
Following two civil clients north; 38 crew based in Queensland today.
- 20261.86 million m³
Placed since day one — and still no structural failure on our record.