Pour 01 // LVL 00 // Grid A–F
Cast in place. Built to outlast us.
Coldset is a specialist concrete contractor. We design the formwork, fix the steel, place the concrete and strip a finish you'll want to touch — on architectural walls, PT slabs, basements and civil works since 1994.
11 live sitesVIC + QLD2,480 m³ placed this month
PC-07 ✓ 28D
Pour 02 // Scope
One crew from footing to roof slab.
- 01
Architectural concrete
Board-marked, off-form and sandblasted walls poured to F3–F4 tolerances, with sample panels before every pour.
F3–F4 · SCC · sealed - 02
Post-tensioned slabs
Banded and flat-plate PT slabs, transfer slabs and podiums — design-and-construct with our own stressing crew.
250–450 mm · 5-day cycle - 03
Basements & foundations
Raft slabs, pile caps, retaining and core walls, waterproof basements with crystalline and hydrophilic joint systems.
Rafts to 1,800 m³ - 04
Civil structures
Culverts, abutments, headwalls and tanks for road, rail and water clients — designed for 100-year service life.
Exp. class B2–C2 - 05
Formwork design
Temporary works engineering, pour sequencing and shop drawings for every lift, checked by an independent engineer.
In-house engineers
Pour 03 // Log
Every pour, on the record.
Each truck is docketed, each pour is tested. We publish slump, flow and cube strengths for every element — a few from this fortnight below.
| Pour | Date | Site / element | Vol. | Mix | Slump / flow | 7-day MPa | 28-day MPa | Result |
|---|---|---|---|---|---|---|---|---|
| NP-31 | 14 Oct | Northcote Pool — board-marked wall W7, lift 2 | 48 m³ | C50/60 SCC | 690 mm | 46.2 | — | Due 11 Nov |
| FT-88 | 09 Oct | Fitzroy Terraces — L07 PT slab, pour 2 of 2 | 212 m³ | C40/50 | 110 mm | 37.8 | — | Due 06 Nov |
| NW-52 | 18 Sep | Newstead Wharf — L03 transfer slab | 386 m³ | C50/60 | 100 mm | 44.1 | 66.8 | Passed |
| MU-17 | 12 Sep | Moorooka Underpass — east abutment stem | 164 m³ | C40/50 | 120 mm | 36.4 | 55.9 | Passed |
| BL-09 | 05 Sep | Brooklyn Hub — raft slab bay 4 | 540 m³ | C32/40 | 100 mm | 29.9 | 45.3 | Passed |
Pour 04 // Recent
Stripped, signed off, standing.
Pour 05 // Finish
A finish you can touch.
Concrete remembers everything: the grain of the board, the tie, the vibrator, the weather. We agree a finish class before we quote and pour a 1.2 × 1.2 m sample panel for sign-off before the first wall.
Finish classes F1–F4Stop // Think // Pour
Nobody gets hurt for a slab.
Pre-pour inspections are signed by the foreman, the engineer and the pump operator. Exclusion zones go up before the boom unfolds. Every shift starts with a toolbox talk — in six languages if that's what the crew needs.
Safety & accreditations- TRIFR (12-month rolling)
- 1.1
- AIFR
- 0.0
- Toolbox talks FY26
- 7,420
- Pre-pour checks signed
- 100%
Next pour // Yours
Got a pour coming up?
Send drawings, a programme and a finish class. An estimator calls back within one working day; a priced tender follows within ten.