Pour 01 // LVL 00 // Grid A–F

Cast in place. Built to outlast us.

Coldset is a specialist concrete contractor. We design the formwork, fix the steel, place the concrete and strip a finish you'll want to touch — on architectural walls, PT slabs, basements and civil works since 1994.

11 live sitesVIC + QLD2,480 m³ placed this month

PC-07 ✓ 28D

Section drawing through a multi-storey in-situ concrete building with slabs, columns, stair and basement
PC-07 · 4.2 tSection A–A · 1:100
1.86Mm³Concrete placed since 1994
32Years on site, zero structural failures
140Direct crew — no labour hire
1,214LTI-free days · all sites

Pour 03 // Log

Every pour, on the record.

Each truck is docketed, each pour is tested. We publish slump, flow and cube strengths for every element — a few from this fortnight below.

Pour log · all sites · 01–16 Oct 2026Cubes tested by an independent accredited lab
Recent pours with mix, slump and cube strengths
PourDateSite / elementVol.MixSlump / flow7-day MPa28-day MPaResult
NP-3114 OctNorthcote Pool — board-marked wall W7, lift 248 m³C50/60 SCC690 mm46.2—Due 11 Nov
FT-8809 OctFitzroy Terraces — L07 PT slab, pour 2 of 2212 m³C40/50110 mm37.8—Due 06 Nov
NW-5218 SepNewstead Wharf — L03 transfer slab386 m³C50/60100 mm44.166.8Passed
MU-1712 SepMoorooka Underpass — east abutment stem164 m³C40/50120 mm36.455.9Passed
BL-0905 SepBrooklyn Hub — raft slab bay 4540 m³C32/40100 mm29.945.3Passed
7-day cube28-day cubeTarget strength Full pour log — Merri Creek Library →

Pour 05 // Finish

A finish you can touch.

Concrete remembers everything: the grain of the board, the tie, the vibrator, the weather. We agree a finish class before we quote and pour a 1.2 × 1.2 m sample panel for sign-off before the first wall.

Finish classes F1–F4
Rough F1 concrete sample with open textureF1
RoughFootings, backfilled walls
General F2 concrete sample, even greyF2
GeneralPainted or clad faces
Smooth F3 off-form concrete sample with four tie holesF3
Off-formSmooth, tie-hole pattern
Board-markedArchitectural, sealed

Stop // Think // Pour

Nobody gets hurt for a slab.

Pre-pour inspections are signed by the foreman, the engineer and the pump operator. Exclusion zones go up before the boom unfolds. Every shift starts with a toolbox talk — in six languages if that's what the crew needs.

Safety & accreditations
LTI-free days, all sites 1,214 Since 22 June 2023 · updated every Monday
TRIFR (12-month rolling)
1.1
AIFR
0.0
Toolbox talks FY26
7,420
Pre-pour checks signed
100%

Next pour // Yours

Got a pour coming up?

Send drawings, a programme and a finish class. An estimator calls back within one working day; a priced tender follows within ten.