We buildup.Fast.
Steeplejack is a high-rise contractor for residential towers, hotels, student living and mixed-use. Self-climbing cores, a six-day floor cycle and bathroom pods craned in finished — so your building tops out months earlier.
Live from site — all six towers
Gate counts at 06:30 · Mon 20 Oct
Two luffers on Granville Yards, one climbing inside every core.
Average cycle across all sites: 6.2 days per floor.
Inducted, signed in and briefed at this morning's toolbox talks.
2.9 million hours worked since our last lost-time injury.
Built from the core out
The core climbs two levels ahead of the slabs on its own hydraulic rig. Tables fly up behind it, pods go in as each deck is poured, and the envelope follows six floors below. Nothing waits for anything else.
What we do
Four ways to get your tower up.
Appoint us as construction manager, general contractor or specialist core contractor — or bring us in at concept to make the structure buildable at speed.
Construction management
Open-book trade packages, one programme and a site team that runs the gates, cranes and hoists for you.
- Fee on cost, shared savings
- Trade package procurement
General contracting
Lump-sum or GMP delivery of the whole building, from shoring to handover, with one point of responsibility.
- Fixed price or GMP
- Bonded, insured, warrantied
Self-climbing cores & jumpform
Our own hydraulic climbing rigs and crews pour a core level every three days, independent of the crane.
- Three-day core cycle
- Screens with full edge protection
Preconstruction & modular
Buildability reviews, logistics plans and factory-finished bathroom pods that cut weeks from every floor.
- Cost plans in 10 days
- Pods tested before lifting
The six-day floor cycle
One floor. Six days. Every week.
A typical floor of a residential tower, from setting out to concrete — the rhythm every trade on our sites plans around.
- D1Mon
Set out & jump core
Survey grid lines, climb the core rig and screens one level.
- D2Tue
Fly tables
Strip, lift and set the table forms on the new deck.
- D3Wed
Deck & edges
Edge forms, perimeter protection and soffit checks.
- D4Thu
Rebar & tendons
Bottom mat, post-tensioning tendons, top mat.
- D5Fri
Cast-ins & sign-off
Sleeves, pod drains and engineer's pre-pour inspection.
- D6Sat
Pour
Pump, place and finish 140 m³ before lunch. Repeat.
Safety
Fast is only fast if everyone goes home.
Speed on our sites comes from planning, not pressure. Every lift is planned the day before, every worker can stop the job without asking, and every near miss is reported, logged and fixed within 24 hours.
- TRIR, rolling 12 months
- 0.41
- AIR, rolling 12 months
- 0.09
- Toolbox talks this year
- 2,860
- Near misses reported
- 1,214
Across six live sites and 2.9 million hours worked. Certified to ISO 45001 since 2019.
Tendering in 2027?
Got a tower to build?
Send us drawings at any stage. You'll get a buildability review, a cost plan and a cycle-by-cycle programme within ten working days.